ISO 16159-2012 pdf free download.Space systems — Launch pad and integration site — Facility, system and equipment failure analysis
Systémes spatlaux — Aire de lancement et site d’intégration — Analyse de défaillance des installations, du système et de léquipement.
operator. Final failure analysis reports are coordinated with the customer and, if necessary, with the developer and manufacturer of the primary failed component.
5.5 The final failure analysis report shall be distributed to
— the operator,
— the facility, system or equipment developer,
— the developer of the primary failed component (if other than the facility, system or equipment developer),
— the facility, system or equipment supplier,
— the manufacturer of the primary failed component (if other than the facility, system or equipment supplier), and
— the customer.
6 Preventive actions
6.1 The corrective and preventive actions recommended in the final failure analysis report shall be implemented
by the affected organization
— in accordance with instwctions from the customer, if the failure occurred during acceptance testing, or
— as specified in the final failure analysis report, if the failure occurred during operations.
6,2 Corrective and preventive actions for failures shall be approved by the developer. The implementation of corrective and preventive actions is coordinated with the customer.
6.3 Corrective and preventive actions shall directly address the probable cause of the failure and any incidental malfunctions discovered during the course of the analysis. Corrective and preventive actions may relate to the design and manufacture of hardware or software, the adequacy or applicability of current documentation, or the effectiveness of operational, maintenance, organizational or business processes.
6.4 Corrective and preventive actions shall be written as specific measures with parameters that can be achieved, quantified and verified. They shall state specific actions (e.g. ‘inspect the component at six-month intervals) and shall not express vague goals (e.g. “improve inspection).
NOTE Annex A deals with potential corrective actions.
6.5 The developer, supplier and customer may jointly revise the corrective and preventive actions in the course of implementation. Such revisions shall be approved in accordance with 5.4. distributed in accordance with 5.5, and stored with the final report.ISO 16159-2012 pdf free download.

Download Information
Go To Download

All resources on this website are from the Internet. It is only for personal study and research. No one is allowed to use it for any commercial purpose. If you need, please buy the genuine standard. If there is any infringement of your copyright, please contact the webmaster in time, and I will correct it immediately.